Application: | Power, Electronic, Instrument |
---|---|
Phase: | Three |
Core: | Core-type Transformer |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Rated capacity(kVA) |
High voltage(kV) | High voltage tapping range (%) |
Low voltage(kV) | Vector Group symbol | No-load Loss (kW) |
On-load Loss(kW) | No-load Loss (kW) |
On-load Loss (kW) |
Short-circuit resistance (%) |
No-load Current (%) |
Model 11 | Model 13 | |||||||||
30 | 6 6.3 10 10.5 11 |
±2 × 2.5 or ±5 |
0.4 | Dyn11 or Yyn0 |
0.1 | 0.63/0.6 | 0.08 | 0.63/0.6 | 4.0 |
1.5 |
50 | 0.13 | 0.91/0.87 | 0.1 | 0.91/0.87 | 1.3 | |||||
63 | 0.15 | 1.09/1.04 | 0.11 | 1.09/1.04 | 1.2 | |||||
80 | 0.18 | 1.31/1.25 | 0.13 | 1.31/1.25 | 1.2 | |||||
100 | 0.2 | 1.58/1.5 | 0.15 | 1.58/1.5 | 1.1 | |||||
125 | 0.24 | 1.89/1.8 | 0.17 | 1.89/1.8 | 1.1 | |||||
160 | 0.28 | 2.31/2.2 | 0.2 | 2.31/2.2 | 1.0 | |||||
200 | 0.34 | 2.73/2.6 | 0.24 | 2.73/2.6 | 1.0 | |||||
250 | 0.4 | 3.2/3.05 | 0.29 | 3.2/3.05 | 0.9 | |||||
315 | 0.48 | 3.83/3.65 | 0.34 | 3.83/3.65 | 0.9 | |||||
400 | 0.57 | 4.52/4.3 | 0.41 | 4.52/4.3 | 0.8 | |||||
500 | 0.68 | 5.41/5.15 | 0.48 | 5.41/5.15 | 0.8 | |||||
630 | 0.81 | 6.2 | 0.57 | 6.2 | 4.5 | 0.6 | ||||
800 | 0.98 | 7.5 | 0.7 | 7.5 | 0.6 | |||||
1000 | 1.15 | 10.3 | 0.83 | 10.3 | 0.6 | |||||
1250 | 1.36 | 12 | 0.97 | 12 | 0.5 | |||||
1600 | 1.64 | 14.5 | 1.17 | 14.5 | 0.5 | |||||
2000 | 1.94 | 18.3 | 1.36 | 18.3 | 5 | 0.4 | ||||
2500 | 2.29 | 21.2 | 1.6 | 21.2 | 0.4 | |||||
Waste incineration project,three gorges dam project,zhuhai-hong kong-macao bridge,state grid corporation,coal mine,photovoltaic project Power stations,compact transformer station, normal industrial factories , mines , hospitals, buildings, airports, tunnels, chemical plants, nuclear power plants etc.and so on.
After Sales Service
a. Up to 24 months quality guarantee period. If there is any problem in the operation of your transformer, Daelim's after-sales team will solve it promptly and quickly;
b. Local after-sales installation service team. Whether you are in North America, South America or other regions, Daelim's local team can provide you with professional transformer installation, commissioning, maintenance and other services;
c. Daelim provides remote video guidance for transformer installation.
1.Q: Are you manufacturer?
A: Yes, we are manufacturer.
2.Q: Can I get guarantee of products?
A: Yes, each product is 1 year quality warrantee under customer correct using the products.
3.Q: How to buy it? What about the delivery?
A: Please contact me by email or online, let me know your requirement, we will provide you professional solution. We have shipping agent can choosing the cheapest and fastest delivery. FOB,CIF, C&F, FCA or EXW, each is available to us
4.Q: How can I pay you?
A: T/T and L/C
5.Q: What about the production?
A: Produce time is 2~4weeks.
6.Q: Could you offer some spare parts?
A: Yes, no problem.