Customization: | Available |
---|---|
Application: | Power, Electronic, Instrument |
Phase: | Three |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
10kv-35kv Distribution Transformer | ||||||
Rated Power(kva) | High Voltage(kv) | Low Voltage(kv) | Connection symbol | No-load loss(w) | On-load loss(w) | No load current(%) |
400kva | 10kv 11kv 20kv 35kv |
0.4 | Ydn11 Yyn0 |
570 | 4300 | 0.45 |
500kva | 680 | 5410 | 0.45 | |||
630kva | 810 | 30800 | 0.4 | |||
800kva | 980 | 7500 | 0.4 | |||
1000kva | 1150 | 10300 | 0.35 | |||
1250kva | 1360 | 12000 | 0.3 | |||
1600kva | 1640 | 145000 | 0.6 | |||
2000kva | 1950 | 19140 | 0.6 | |||
2500kva | 2340 | 22220 | 0.5 |
Waste incineration project,three gorges dam project,zhuhai-hong kong-macao bridge,state grid corporation,coal mine,photovoltaic project Power stations,compact transformer station, normal industrial factories , mines , hospitals, buildings, airports, tunnels, chemical plants, nuclear power plants etc.and so on.
1.Q: Are you manufacturer?
A: Yes, we are manufacturer.
2.Q: Can I get guarantee of products?
A: Yes, each product is 1 year quality warrantee under customer correct using the products.
3.Q: How to buy it? What about the delivery?
A: Please contact me by email or online, let me know your requirement, we will provide you professional solution. We have shipping agent can choosing the cheapest and fastest delivery. FOB,CIF, C&F, FCA or EXW, each is available to us
4.Q: How can I pay you?
A: T/T and L/C
5.Q: What about the production?
A: Produce time is 2~4weeks.
6.Q: Could you offer some spare parts?
A: Yes, no problem.